Karsa Konsultan theme demo by Indra Kreatif. The business name and content are only examples.

Theme details Use this theme
Karsa Konsultan

Building engineering consultants, Surabaya

Buildings worked out before they are built.

Structure, MEP, facade, and energy audits in one team, so the drawings that reach your contractor already fit together and nothing gets torn out on site.

Construction drawings with a pen on a desk
Sheet S-204: beam-column joint detail

One building, four layers of expertise

  1. Stage 01

    Structure

    Load, earthquake, and foundation analysis. We recheck the contractor’s drawings before a single rebar goes in.

    What you get: Certified structural drawings and seismic calculations to SNI 1726.

  2. Stage 02

    Mechanical, electrical, plumbing

    Power, air conditioning, water, and fire protection are designed together, so they never clash above the ceiling.

    What you get: A 3D coordination model, a bill of materials, and a commissioning schedule.

  3. Stage 03

    Facade

    Glass, shading fins, and panels are calculated against sun and wind, not just looks.

    What you get: Facade heat simulation, joint details, and water-tightness tests.

  4. Stage 04

    Energy audit

    Once the building runs, we measure power use floor by floor and find the savings that pay back fastest.

    What you get: An audit report, solar panel recommendations, and 12 months of monitoring.

Services

Structural design
High-rises, wide-span warehouses, renovation and strengthening.
MEP design
Electrical, HVAC, plumbing, fire protection, and smart building systems.
Site supervision
Daily supervision on site and weekly reports to the owner.
Building fitness review
Inspections for the Certificate of Building Fitness, for old and new buildings.
Energy audit
Measurement, analysis, and a plan to cut power use.
Construction management
Schedule, cost, and quality from tender to handover.

Results you can measure

18-storey office tower, West Surabaya

West Surabaya

18-storey office tower

–22%

power use after the facade and HVAC were redesigned.

Food processing plant, Pasuruan

Pasuruan

Food processing plant

7 months

from first drawing to commissioning, a month ahead of schedule.

Type C hospital, Sidoarjo

Sidoarjo

Type C hospital

0

major design changes during construction, thanks to 3D MEP coordination.

Tell us about your project

A free 45-minute first consultation with a senior engineer. We reply within one business day.